韩国三级理韩国三级理人伦-韩国三级动漫-韩国三级大全-韩国三级hd中文字幕李采潭-亚洲高清影院-亚洲高清一区二区三区四区

EN
中文
Language selection:
 
LUNDA • NEWS
Lunda lighting products are fashionable and hard-working, and are widely used in outdoor performances, KTV, bar lighting equipment and other engineering applications.
Product Navigation
 
Professional stage lighting
CONTACT US

Guangzhou Lunda Stage Lighting Equipment Co., Ltd.
Contacts: Mr. Liu
Cell phone: 13922765392
Cell phone: 18520725392
E-mail: 1143064667@qq.com
Addr.: Longjiao Road, Longhu Village, Shijing Town, Baiyun District, Guangzhou

QQ Service Online:
在線咨詢在線咨詢
Stage lighting equipment maintenance
Release Date: [2019/5/29 17:34:56]    Total read [2019] Times
Lighting precautions
1, open half an hour before opening all the equipment, low temperature preheating, while testing all equipment and lines. Low temperature state is the light can be light;
2, boot up to fifteen minutes after all the equipment zero, so that equipment cooling, cooling time of not less than fifteen minutes;
3, after the heat, you can officially enter the music show stage;
4, the end of the show, the guests leave, the lighting division should close all the equipment, and let the equipment heat 15 to 20 minutes, and then the equipment for storage or mask, lighting division to leave.
Lighting equipment maintenance relative to the sound is more complex, but also more trivial, basically do the daily routine testing, weekly regular testing, monthly equipment maintenance and appropriate debugging;
Conventional detection ranges include:
1, whether the light bulb can be normal;
    2, all equipment wiring is normal;
3, all the equipment can be used normally, including the light control switch, color changer control, computer lights, etc. are normal;
4, DMX512 signal whether the normal control of lamps;
5, special effects equipment is normal use, and filled with the necessary materials, such as: smoke machine, fog machine, snow machine, bubble machine, etc .; stage lighting
Weekly periodic testing
Weekly periodic inspection In addition to the daily monitoring of all the items need to pay attention to the following points
1, in the week when the main test equipment connection, including the power connection, DMX512 connection, etc., to see if there is loosening, whether there are breakpoints and so on;
2, at the same time in the week when the test should be more comprehensive adjustment of the bit and DMX512 programming;
Monthly equipment maintenance and appropriate adjustments
Appropriate adjustment of the month In addition to the daily monitoring and weekly testing of all the work, it will be a very meticulous work, the need for coordination of multiple departments, such as actors, bands, weak, security, cleaning, etc., while the month When testing, complete the following tasks.
1, the lamp bit adjustment; because in use will appear part of the light position or guest area changes, resulting in changes in lamp position, so every month should be adjusted, of course, including DMX512 signal control of the computer lights ;
2, the detection of mechanical equipment, including the computer light motor, the color of the motor, special equipment, such as the nozzle, and so on;
3, check all lines. To detect whether there is a breakpoint, broken, whether there is leakage, because in use some of the human factors is the line there are a variety of unexpected situations, such as the leak of the wire was trampled, often plug the wire or breakpoint, Occasionally because of sprinkling with drinks on the line leakage and even short circuit, etc., so this test should be very careful. This test requires weak to complete;
4, clean the lamp inside and outside the dust and garbage. The light in use there will be some garbage, such as light bulb explosion in the lamp body of garbage, another long time in the audience area of ​​the computer lights, special effects machinery easily fall into some garbage, such as ribbons, glass ballast, drinks Of the residue and so on. So the lamp to the external garbage and dirt wipe clean, and the lights inside the garbage removed, this link needs cleaning with;
5, check all fire protection equipment. Lighting, sound is the most concentrated in the circuit of a type of work, strong power into the weak out of the relevant equipment and more related wire, so fire in the light work is the most important in the monthly routine check With the Ministry of Security, with all the fire protection facilities, fire fighting equipment for a comprehensive inspection, monitoring range, including the normal level of fire equipment, fire equipment selection is normal, whether the shelf life and so on;
In addition to the daily monitoring, weekly testing, monthly full inspection, the lighting division must be on the equipment and the environment is very understanding of all the circumstances, so please deal with in a timely manner, so as to get a good visual environment at the same time there are enough Security.
Copyright © Guangzhou Lunda Stage Lighting Equipment Co., Ltd. All Rights Reserved.   粵ICP備2021091255號   INXUN.COM.CN
主站蜘蛛池模板: 区二区三区四区免费视频| 中国黄色影片| 日本成人在线播放| 99久久精品国产高清一区二区| 美女泡妞视频免费的| 一个人看的视频在线www高清| 大香焦久久| 情趣高h| 奇米欧美| bnb98免费选择影院| 一级片免费观看| 初恋情人韩国免费| 女女互慰吃奶互揉网站| 日韩亚洲色图| 最新老头与老头同性视频| 男人的伸到男人里| 欧美肥老太婆交| 高清欧美日本视频免费观看| 亚洲伊人色图| 99精品久久久久久久免费看蜜月| xxⅹ护士代套子bd| 女人扒开| 久青草青综合在线视频| 91五月天| 欧美日韩一区二区在线视频| 一级毛片免费高清视频| 日韩成人综合网| 欧美疯狂party性派对精品| 99久久国语露脸精品对白| 非洲黑人xxxxxbbbbbb| 九七97影院理论片手机在线观看| 秋霞网亚洲成a人片| 日本精品一在线观看视频| 拍拍拍成人免费高清视频| 在线观看18瑟瑟视频| 爸爸操女儿视频| 欧美性69式xxxx护士| 日产精品一线二线三线区动漫| www.国产一区二区| 在线视频 91| 一级特黄录像视频免费|